Jan 10, 2007 04:32
17 yrs ago
Chinese term

基面能起修平作用

Chinese to English Tech/Engineering Engineering: Industrial
环氧中涂:“盈拓” 牌 EC2101、EC2100
对基面能起修平作用;提高机械性能,抵御表面作业时带来的荷重与撞击破坏。

Proposed translations

10 hrs
Selected

[it may] rectify/correct the levelness of a base/founding-level surface

http://engine.cqvip.com/content/s/93808x/2003/000/011/ny11_s...


http://www.jsfsw.net/new_view.asp?id=947



--------------------------------------------------
Note added at 1 day10 hrs (2007-01-11 15:23:18 GMT)
--------------------------------------------------

"it" is 盈拓” 牌 EC2101 or EC2100
Something went wrong...
3 KudoZ points awarded for this answer.
1 hr

with polising and trueing performance to base layer

with polising and trueing performance to base layer
Something went wrong...
21 hrs

the subgrade surface served the leveling function

PDF] LABORATORY EVALUATION OF RUTTING RESISTANCE OF GEOSYNTHETICS ...File Format: PDF/Adobe Acrobat - View as HTML
TS 80 geotextiles placed between the base course and subgrade soil served the separation. function well without failure after 10000 wheel passes. REFERENCES ...
www.ies.org.sg/journal/past/v44i2/v44i2_3.pdf - Similar pages

[PDF] Repeated-load behaviour of geosynthetic-built unbound roadsFile Format: PDF/Adobe Acrobat
subgrade surface level, had been made. With a wider loaded ... served stiffnesses to find an appropriate value of C. *. (a function ...
article.pubs.nrc-cnrc.gc.ca/ppv/RPViewDoc?_handler_=HandleInitialGet&journal=cgj&volume=34&ca... - Similar pages

[PDF] ACPA Covers Concrete Pavement SmoothnessFile Format: PDF/Adobe Acrobat - View as HTML
subgrade surface completely and not lie on any clumps of dirt or rocks. ... During that time, he served as a mobile concrete laboratory project ...
www.pavement.com/CPP/2005/CPP-April05.pdf - Similar pages

Something went wrong...
1 day 1 hr

trimming plane advantage for ground foundation.

FYI
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search