Job closed
This job was closed at Mar 14, 2024 10:00 GMT.

Professional Maltese freelance translators, New Energy field.

Job posted at: Mar 14, 2024 09:37 GMT   (GMT: Mar 14, 2024 09:37)

Job type: Translation/editing/proofing job
Service required: Translation


Languages: English to Maltese

Job description:
Hello,
I am Chloe from GEL translation, we are urgently in need of Maltese freelance translators who can translate in the field of New Energy (e.g. Wind Power, Photovoltaics, Energy Storage and Electric Vehicles etc.) Here is some sample text for your reference:
Step 4 Place the next battery module on top of the first battery module and secure the battery modules with the fixing plate. Repeat this step until all battery modules have been installed. Place the high-voltage box on top of the last module and secure it using the L-shape wall hanging bracket. Step 5 Attached the L-shape wall hanging bracket onto the high voltage box as shown in the image. Our requirements:
1. Native Maltese peaker.
2. Willing to use CAT tools.
3. More than three years of translation experience; linguist, with translation certificate or expertise in the relevant field is preferable.
If you are interested in working with us, Please contact my email with your latest English CV and expected rate (USD or EUR). Thanks!

Budget and payment details:
Budget information for this job is restricted to those who meet the requirements of the job.
Payment terms: 30 days from the delivery date.
Poster country: China

Service provider targeting (specified by job poster):
Membership: Non-members may quote after 12 hours
Subject field: New Energy(Photovoltaic Products)
Quoting deadline: Mar 14, 2024 10:00 GMT
Delivery deadline: Apr 14, 2024 10:00 GMT
Additional requirements:
1. Bachelor degree or above
2. This is a long term partnership.
3. Trados and other CAT tools may be required.
4. If you need more information, please contact us at first.ssgel-global.com

Sample text: Translating this text is NOT required
Step 4 Place the next battery module on top of the first battery module and secure the battery modules with the fixing plate. Repeat this step until all battery modules have been installed. Place the high-voltage box on top of the last module and secure it using the L-shape wall hanging bracket.
Step 5 Attached the L-shape wall hanging bracket onto the high voltage box as shown in the image.
About the outsourcer:
This job was posted by a Blue Board outsourcer with a "likelihood of working again" average rating of 5 out of 5

Note: You cannot quote because this job is closed.

Contact person title: Professional Maltese freelance translators, New Energy field.